Hexagon Measurement SystemsNo matter what Hexagon measurement equipment or software you use, we want to hear your ideas and suggestions on how we can improve.
Thanks for your assistance in helping us shape the future. |
|
being able to see the report window (as the part is running) in the inspect application.
Having the ability to see the report window while the report is running or even the edit screen while the program is running in Inspect would help us determine where in the program a fault occurred. All we can see currently (In 5.1) is the CAD, %, and pass/fail screens
How can i stop nexus metrology reporting every single time when one feature execute? any solution?
Button for non-calibrated angles
My machine has a tool charger that has eight tools. When I start the program from the server, the program tells me that I have some angles that are not calibrated. I then have to manually search the program and calibrate tool by tool. After that I have to exit the program
and to enter again to make sure that I have calibrated all the angles. It is necessary to put a button that, with one click, will mark those in the head that are not calibrated without exiting the program.

Hole or no hole
Sometimes, I like to check if there is a hole at the right spot, not its coordinates.
or when the left part has a hole, and the right part doesn't.
So could You make a function, that "dives" into a hole, with a depth that I type in, and move to the avoidance distance, before it continues with the next feature?
Allow comment to be added to explain/mark bad results
Customer Request
Trend reports are very important for their operators. They mentioned wanting some kind of way to mark events so that they can understand why dips might have happened (or able to isolate out dates where you know why parts dipped out of tolerance and are not relevant)
Merge data from two programs into one report
Customer Request
Want the ability to merge two reports together. They can have 2 routines for one part, so merging would make it easier to share with customers. (They do this today by cut and pasting in Excel)
Allow previous runs of a specific sample to be ignored for statistics
Dear sirs,
i have 2 recommendations (if not implemented on pro version):

The idea is to have the possibility to engage or not previous measured samples, why? Because in certain situations we don't want to consider the several times that the same program runned as different parts with same reference, that is, in the case of an iterative measure and tunning of an assembly we just want to consider the last one for the general statistics...
Ability to manage speed of simulation
I would be so handy if the speed of simulation in off-line mode is manageble over a slide by mouse or by arrow up / down buttons. So I can high-speed trough for example a multi-hole pattern.
Kundesupport af UserEcho
