
0
Require Tracker Field Checks on a scheduled basis, or at least notify Operator
Kevin V 3 years ago
in Metrology Software / Metrology Asset Manager
•
updated by Benjamin Stocker 2 years ago •
1
Is there a way to force field checks on a schedule basis, otherwise the tracker will not measure? Or to at least send a forced notification?
Customer support service by UserEcho
This function was introduced in version 5.1. Different time intervals can be set in which a field check must be carried out. The corresponding status is displayed on the Asset Detail Page.
Last Performed Check Status (hexagonsfx.com)