0
Require Tracker Field Checks on a scheduled basis, or at least notify Operator
Kevin V il y a 3 ans
dans Metrology Software / Metrology Asset Manager
•
mis à jour par Benjamin Stocker il y a 2 ans •
1
Is there a way to force field checks on a schedule basis, otherwise the tracker will not measure? Or to at least send a forced notification?
Service d'assistance aux clients par UserEcho
This function was introduced in version 5.1. Different time intervals can be set in which a field check must be carried out. The corresponding status is displayed on the Asset Detail Page.
Last Performed Check Status (hexagonsfx.com)