0

Require Tracker Field Checks on a scheduled basis, or at least notify Operator

Kevin V 3 jaar geleden in Metrology Software / Metrology Asset Manager bijgewerkt door Benjamin Stocker 1 jaar geleden 1

Is there a way to force field checks on a schedule basis, otherwise the tracker will not measure? Or to at least send a forced notification?

This function was introduced in version 5.1. Different time intervals can be set in which a field check must be carried out. The corresponding status is displayed on the Asset Detail Page.

Last Performed Check Status (hexagonsfx.com)