Hexagon Measurement SystemsNo matter what Hexagon measurement equipment or software you use, we want to hear your ideas and suggestions on how we can improve.
Thanks for your assistance in helping us shape the future. |
Aucun sujet similaire trouvé.
+8
Terminé
Send an email alert...
Paul Hewitson il y a 7 ans
dans Metrology Software / Metrology Asset Manager
•
mis à jour par neil kay il y a 5 ans •
3
As of yesterday, I'm now programming in an office at the opposite end of the factory to the CMM.
The operator isn't always at the CMM especially if it is a long program.
Could PC-DMIS be set to send an email out to specified users when:
1) the program stops when the probe crashes
2) the probe needs manually removing/inserting
3) the program reaches the end
0
Location Icons at SFX iPhone App too small and hard to see. Size should be bigger and color a bit brighter
olaf krueger il y a 2 ans
dans Metrology Software / Metrology Asset Manager
•
mis à jour par Benjamin Stocker il y a 2 ans •
2
0
Require Tracker Field Checks on a scheduled basis, or at least notify Operator
Kevin V il y a 3 ans
dans Metrology Software / Metrology Asset Manager
•
mis à jour par Benjamin Stocker il y a 2 ans •
1
Is there a way to force field checks on a schedule basis, otherwise the tracker will not measure? Or to at least send a forced notification?
Service d'assistance aux clients par UserEcho