+4
Completed

Integrate leapfrog using touchprobe

sebastiaan kuiper 7 years ago in Metrology Software / TubeShaper updated by anthony vianna 4 years ago 2

Please integrate leapfrog using touchprobe. When doing the current leapfrog (measure last two straights) it is sometimes not possible to measure tubes with a very long straight (2000-3000mm) in between the bends with a "standard" tubearm. This will be possible using a traditional leapfrog (or two).

The use of a "T" to displace the tube on long straights is scheduled.

Same function as GTube.

Completed

This can already be done with a touch probe, through RDS.