Hexagon Measurement      Systems

No matter what Hexagon measurement equipment or software you use, we want to hear your ideas and suggestions on how we can improve.

  • Your feedback and voting will benefit the majority of users.
  • You have 10 votes which you can allocate to your own or other users ideas.
  • We will focus on trying to realize the top voted items in our future products.

Thanks for your assistance in helping us shape the future.

0

CAD graphics improvement

Justin Doyle 3 years ago in Metrology Software / Inspect 0

Need to see flipped normals without having to click reverse cad faces first

0

Nickname should carry over to report names (uses PRG name currently) in INSPECT

S_Grumbles 3 years ago in Metrology Software / Inspect 0

INSPECT allows for a NICKNAME for the program (Icon) but then in the REPORT section it reverts to the Program name. The operator won't know the program name they will identify with the nickname so the nickname should be used for the reports as well. 

0

Allow Inspect slideshows to handle dimensions created within loops

Kyle Jordan 3 years ago in Metrology Software / Inspect 0

Within Inspect, we are not able to add multiple dimensions to slideshows if they are created within a loop. The dimension is able to be accessed via arrays within PC-DMIS, however Inspect does not allow me to do this.

Example:

I loop through 10 parts, and within the loop I am dimensioning the diameter of each part as a location feature called "DIAMETER". In Inspect, I would like my slideshow that shows the DIAMETER dimension to update for each part in the loop, but currently it only displays the DIAMETER feature for part 1 (loop 1) and it stays static during the rest of the runs.

0

Allow routines(s) to be scheduled to run at start of day - and block execution until run

neil kay 4 years ago in Metrology Software / Inspect 0

From PC-DMIS Forum post 

"Hello,
We have a pair of calibration programs that need to be run at the beginning of the day prior to running production. How could I automatically "lock up" the machine until the operator runs these programs? If there is a method of doing this in VBA, that would be ideal.
Thanks,
M"

0

ABILITY TO DELETE REPORTS AFTER MEASUREMENT

garry prosser 6 years ago in Metrology Software / Inspect updated by neil kay 6 years ago 2
0
Completed

Could we add to Inspect configuration settings for PCDMIS behavior.  For...

Guillermo 7 years ago in Metrology Software / Inspect updated by neil kay 5 years ago 3

Could we add to Inspect configuration settings for PCDMIS behavior.  

For example, PCDMIS visible/invisible


Also, I am finding that when running PCDMIS under inspect, it is modifying the PCDMIS layout.  I am not sure whether it is Inspect or SlideShow that is doing so yet.  Using Inspect 3.2.  What I can see is that the Edit windows is closed, and all of the toolbars are cramped to the left side.

0
Completed

SlideShow template creation - Allow for further customization of label (dimension controls)

Guillermo 7 years ago in Metrology Software / Inspect updated by KAY Neil 4 years ago 5

SlideShow allows the user to grab any dimension from PCDMIS routine and annotate the slide with that element as a label control.  However, it does not offer or allow for enough customization like PCDMIS STI+ did.

For example, say a dimension location that has XYD is selected.  the control should allow user to only add D, or Y and D, etc.  Instead of all dimensions.  The label should allow us to specify applying color (Green, Yellow, Red) to percent of tolerance for any dimension.  This could be via a background color for the label.


Suggestion for leader lines.  Line color, End type Arrow or dot, relative to two features checkbox.  If the dimension label is for a distance or an angle for example, leader line (relative to two features) could be made to point to two areas on screen.


Example screen capture of two Location dimension attached.  It would be nice if user would see list at left showing available report axes and select the ones to show and use for label.  When evaluating Green,Yellow, Red, only that dimension axes would be evaluated. 

Image 201



0
Completed

Playlist end of execution should show a summary containing all the measured items, not just the last

P. Bagniuk 7 years ago in Metrology Software / Inspect updated by neil kay 5 years ago 8

Seamless routines execution without summary screen confirmation after each routine.

Instead, one overall summary screen after playlist is executed.

0
Completed

your measurements

Michael 8 years ago in Metrology Software / Inspect updated by neil kay 6 years ago 4

hello 


I think it would be nice if you can see during your measurements whether something is right or wrong in enspect.

0
Completed

SQ Inspect 3.1 - Clear password field when user name field is cleared or typed over

Guillermo 8 years ago in Metrology Software / Inspect updated by neil kay 6 years ago 4

Using SmartQuality Inspect 3.1 (install set from PCDMIS 2018 R1)

The password field is not getting cleared if a user clears the user name to enter a new one or types over it.  I happen to have two SmartQuality users with the same password. 

I can logout from one and actually type the other username and the password
field is still there uncleared from last user login.  Press sign in and I am logged in. 

We must clear the password field if anything is done to the user name one.