Hexagon Measurement      Systems

No matter what Hexagon measurement equipment or software you use, we want to hear your ideas and suggestions on how we can improve.

  • Your feedback and voting will benefit the majority of users.
  • You have 10 votes which you can allocate to your own or other users ideas.
  • We will focus on trying to realize the top voted items in our future products.

Thanks for your assistance in helping us shape the future.

0
Завершен

Comment Yes / No Auto-continue execution

davehocum 5 лет назад в Metrology Software / PC-DMIS обновлен neil kay 4 года назад 6

Change the Comment Yes / No Auto-continue execution Default settings to be uncheck (Off). 

Every Time I want to place a Yes / No Comment into the program I have too always uncheck the "Auto-continue execution". If I don't uncheck this check box I will get a Warning message "Enter an integer between 1 and 600" after selecting "OK". 

Image 233

0

varied audible feedback tones with tube shaper

Chip / Hydrasource 5 лет назад в Metrology Software / TubeShaper обновлен neil kay 4 года назад 1

When inspecting tubes there should be different tones for successful measurement instead of failed measurement.  There should also be different tones for first scan versus second scan on each straight.   Most important - there should be a different tone when measuring ends - unique from straight 1/2 pass fail.   Again indicating success or fail of attempted tube end scan.   YES there are different tones already so different tones are available - but those varied tones don't associate with desired function.  

0

Set Start Point location with Groups

davehocum 5 лет назад в Metrology Software / PC-DMIS обновлен neil kay 4 года назад 0

When a program execution is stop within a Group the Set Start Point will not be visible. With a large program that contains a large amount of Groups this can be difficult to find the Set Start Point location. Add a Set Start Point at the beginning of the Group and with the Group expanded move the Set Start Point at the last place of execution. This will eliminate the need to expand all Groups to locate the Set Start Point.

0

Custom Probe Builder Availability

davehocum 5 лет назад в Metrology Software / PC-DMIS обновлен 4 года назад 1

The Custom Probe Builder should be available for all PC-DMIS CAD versions. This would be another addition to improve the UI.

0

Tabs

joe malone 5 лет назад в Metrology Software / PC-DMIS обновлен neil kay 4 года назад 1

Tabs are not easily visible when selecting "Best fit" in the alignment window. They are  partially blocked by the DOF window 

0
Отклонен

blade analysis graphs

RAMESH 6 лет назад в Metrology Software / PC-DMIS обновлен neil kay 4 года назад 2
0

Alignement keeping axe CAO or

DAVID 6 лет назад в Metrology Software / TubeShaper обновлен neil kay 4 года назад 1

When you make an alignment , the point of alignment became origine(X0,Y0,Z0).

would it be possible to keep the coordinates of the cad(X135,Y588,Z15)!!

0

alignement keeping axis systems

Gault yohann 6 лет назад в Metrology Software / TubeShaper обновлен neil kay 4 года назад 0

when i do an alignement PLP , the nominal of the cercle taken from CAD , is changed to X=0 Y=0 Z=0 then I have another nominal in my CAD. so my origin isn't the same but I want my origin in the same place.

IMPORTANT

0

Saving results in excel - Append function

Grzegorz 6 лет назад в Metrology Software / PC-DMIS обновлен neil kay 4 года назад 0

Append function

Possibility to save measurement results in the same worksheet.

0
Отклонен

PC-DMIS CAD++ 2017 R2, here, star combination at Y-plus and Y-minus not working. Tip6 and more tips sens as Tip1 and others respectively, so why its happening ?

Suresh Dhusia 6 лет назад в Metrology Software / PC-DMIS обновлен neil kay 4 года назад 1

Сервис поддержки клиентов работает на платформе UserEcho