0

Saving all related objects

Bill Kulpa منذ 6 سنة في Metrology Software / PC-DMIS تم التحديث من قبل neil kay منذ 5 سنة 0

When I save down from a newer version I'd like all the related object in the routine to save down with it.

I use a lot of forms and report label templates so I'm constantly running from the production floor back to my desk to save each part of the puzzle down to the version running on that CMM..


I know what people are going to say, why not 1 version for everything.

We do our testing offline before migrating to the production machines.

And with 15 CMM's we can't always count on the newer versions working with a particular controller.


خدمة دعم العملاء من خلال UserEcho