0

progress bar

NSF_TUN 8 jaar geleden in Metrology Software / PC-DMIS bijgewerkt door neil kay 5 jaar geleden 0

Hello,

Actually the progress bar don't show the really progressive routine. it's be simple that PcDmis calculate the total number of features (Element) and the % of progressive bar will be calculate on that.

the same pb on Probe calibbration. the % can be calculated on the number of the contact to measered. and the windows can show the actual contact angle that being calibrated.