+4

Possibility to re-call a simultaneously evaluation as an active alignment

Robin hace 3 años en Metrology Software / PC-DMIS 0

I would like to have the possibility to activate a Datum feature alignment where a Datum has a Maximum Material Condition e.g. A/B(M)/C(M) which is used for a simultaneously evaluation. It would make it a lot easier to show some single points deviation or similar to an active alignment instead of adding each point of interest to a Dimension which then needs also put in for simult. check.. greetings Rob